Bannatyne Housing, Dumfries
|
| A detached housing development of 15 homes, built adjacent to the existing Healthclub at Marchfields in Dumfries. Completed mid 2007, the £1.5m project enhanced the local area with this high quality private residential development. |
| —————————————————————————————————— |
|
 |
Great Western Road, Glasgow
|
| Conversion and Extension of existing building to 31 Flats for Abbey Homes. |
| —————————————————————————————————— |
|
 |
The Plaza, Victoria Road, Glasgow
|
| 76 flats for Southplace Homes, concrete framed structure with feature sandstone frontage with brick, render and zinc external finishes. |
| —————————————————————————————————— |
|
 |
Mains Meadow, Lockerbie
|
| Development of 42 houses for Persimmon Homes. |
| —————————————————————————————————— |
|
 |
Pennine View, Carlisle
Contract Value: £1.4m
Duration: 9 months |
| Construction of 33 flats in 4 storey timber frame construction located on the outskirts of Carlisle. The flats included a hot air heating system in lieu of traditional electric or gas. |
| —————————————————————————————————— |
|
 |
Durranhill, Carlisle
Contract value: £2.4m
Duration: 12 months |
| Development of new build and refurbishment works to an existing building to form 21 apartments and 6 houses. |
| —————————————————————————————————— |
|
 |
Manor Park, Monkton
|
| House and Flat development for Lynch Homes, completion mid 2007. 3 Houses and 11 flats to high external and internal standard. |
| —————————————————————————————————— |
|
 |
Bothwell
Contract value: £3.5m
Duration: 104 weeks |
| An exclusive development of eight 3 storey houses, each 4,500 sq ft. Built in traditional construction method with a high standard of finishes and specification throughout, including intelligent house management systems. |
| —————————————————————————————————— |
|
 |
Elliot Street, Glasgow
Contract value: £4m
Duration: 104 weeks |
| The design and construction of 44 flats in two blocks of concrete frame construction, linked with a two storey car park serving the buildings. The concrete frame was designed with flat slab and lift cores to allow a repetitive build programme. Lightweight wall construction to both external and internal walls allowed a fast track fit out programme to be achieved thereafter. |
| —————————————————————————————————— |
|
 |
Crow Road, Glasgow
Contract value: £2.1m
Duration: 72 weeks |
| The design and construction of 24 flats together ground floor retail and parking areas. This project presented particular difficulties in access and distribution due its city centre location. Traditional build construction of blockwork/ concrete progressive collapse to upper floors with steel supporting ground floor. External elevations finished with a modern mix of materials to provide a superior looking project. |
| —————————————————————————————————— |
|
 |
Ewenfield, Ayr
Contract value: £4.25m
Duration: 60 weeks |
| The construction of 21 houses totalling over 52,000 sq feet with largest over 3,000 sq feet, provides a quality development both in terms of accommodation and specification. The timber framed units were constructed on the site of a former garden nursery in an exclusive area of Ayr, as part of an ongoing partnership with the Client. |
| —————————————————————————————————— |
|
 |
Barnhill, Dumfries
Contract value: Ongoing currently £10m
Duration: From August 2002 to Present |
| Seven phases of housing development in Dumfries with currently 251 being completed. |
| —————————————————————————————————— |
|
 |
Dunure Road, Ayr
Contract value: £590,000
Duration: 36 Weeks |
Demolition of existing property and new build timber frame construction of 2 No bespoke dwellings
Both houses were constructed to a very high specification tailored to the requirements of the end users. |
| —————————————————————————————————— |
|
 |
James Watt Dock, Greenock
Contract value: £6,600,000
Duration: 108 Weeks |
Design and build project consisting of three blocks totalling 80 No flats in a timber framed construction and a facing brick finish.
Development built to resemble adjacent warehouse as part of agreement with local Planning Department. |
| —————————————————————————————————— |
|
 |
Kilmaurs Road, Knockentiber
Contract value: £5,800,000
Duration: 80 Weeks |
Development consisting of 68 No timber framed detached and semi-detached units, finished in facing brick.
Substantial earthworks and infrastructure works were required, including the formation of swale and detention basin as part of the suds design. |
| —————————————————————————————————— |
|
 |
Links Road, Prestwick
Contract value: £885,000
Duration: 38 Weeks |
Demolition of existing structure and construction of 12 new build 1 and 2 bedroom timber frame flats. |
| —————————————————————————————————— |
|
 |
Ochlochy Park, Dunblane
Contract value: £937,000
Duration: 38 Weeks |
| Demolition of existing property and new build traditional construction of 3 No high specification dwellings. |
| —————————————————————————————————— |
|
 |
Old Mill Road, East Kilbride
Contract value: £1,275,000
Duration: 42 weeks |
| Traditionally constructed flats for Parklane Ltd. |
| —————————————————————————————————— |
|
 |
Pollockshaws Road, Glasgow
Contract value: £3,100,000
Duration: 72 Weeks |
| The design and construction of 33 flats including basement car park at a city centre location. The works required grouting, piling and permanent sheet piling prior to the construction of the concrete transfer slab and steel slimdeck structure thereafter. |
| —————————————————————————————————— |
|
 |
Printworks, Edinburgh
Contract value: £4,170,000
Duration: 82 weeks |
| Conversion of the old ‘Waddies Printworks’ in Slateford Road, Edinburgh into 64 luxury flats for Southplace Ltd. |
| —————————————————————————————————— |
|
 |
St Nicholas Hotel, Prestwick
Contract value: £1.2m
Duration: 49 Weeks |
Development consisting of 6 No. flats in timber frame construction with adjoining 3 No. townhouses and 3 No. cottages in traditional construction.
A variety of elevation treatments were involved including cedar lining, facing brick, render and stone. |
| —————————————————————————————————— |
|
 |
The Lindens, Bothwell
Contract value: £1,000,000
Duration: 26 Weeks |
The project consisted of the refurbishment of a former convent and coach house into 5 No, flats together with the 6 No. New Build Flats and 1 No. villa.
External works requiring car parking to be formed with crown lifting of perimeter trees and shrubs remaining in position.
The site was situated within a conservation area with particular planning issues to be acknowledged and the building works sympathetic to the surrounding residential area both in materials and workmanship. |
| —————————————————————————————————— |
|
 |
Waterton Court, Carlisle
Contract value: £2,400,000
Duration: 50 weeks |
| Refurbishment of former convent building to 8 apartments and the construction of 23 new units. |
| —————————————————————————————————— |
|
 |
Winton Drive, Glasgow
Contract value: £1,300,000
Duration: 44 Weeks |
Demolition of existing structure and construction of 9 No new build Metsec flats. |
| —————————————————————————————————— |
|
 |
Wood Road, Troon
Contract value: £1,000,000
Duration: 6 Months |
The construction of 16 No. timber framed ‘Tri-villas’ in a fast track programme of 6 months. The villas having increasingly popular three storeys of living space together with high quality external and internal specifications. |
| —————————————————————————————————— |
|
 |
Maybole Road, Ayr
Client: Heritage Homes
|
|
| —————————————————————————————————— |
|
 |
The Orchard, Hamilton
Client: Heritage Homes
Contract Size: £3,700,000
Duration: 60 Weeks |
The overall project consists of the refurbishment of existing building and construction ofnew flats, 43 No. in total, Hamilton.
The works have been subsequently split into two phases, of which phase 1 is completed.Phase 1 consisted of the refurbishment of a late classic mansion (1864 with additions 1871) into 3 No. flats and the construction of 6 No. new build flats and 1 No. attached villa.
The external works will require the reinstatement of the existing formal garden within the new requirement for car parking and access roads. |
| —————————————————————————————————— |
|